Kablann Architecte—DCE, CCTP, DPGF

Tendering

From the CCTP (specifications) to tender comparison, without changing tools.

Tender documents turn the design into a contractual commitment. Kablann brings the drafting of the written documents, their issue to contractors and the comparison of tenders into a single thread — the project's.

The documents

CCTP, DPGF, CCAP: written once, linked everywhere.

The written documents are not kept in a separate folder. They are attached to the project's trade packages and are found by asking a question, not by file name.

What you write today can be reused on the next project.

The practice's library

Your articles, clauses and specification clauses are reused from one project to the next. Your wording stays your own; you just no longer have to retype it.

The DPGF (priced schedule) kept in step with the budget

Quantities and unit prices feed directly into the trade package's budget. The quantities and the budget are no longer two files that drift apart.

The tender sent out

Contractors receive the tender documents, ask their questions and submit their tender in the same place. You see who has responded.

Tenders compared line by line

The comparison is built on the same structure as the DPGF (priced schedule). The difference between two tenders is shown item by item.

What changes

Tender analysis no longer costs you a weekend.

Tender comparison in Kablann: for each trade package, the contractors' tenders set against the estimate, the percentage variance and the lowest bidder
Each tender against your estimate, trade package by trade package

A set structure, readable tenders

When every contractor prices your DPGF (priced schedule), the comparison is immediate and omissions stand out.

Questions in one place

Requests for clarification and their answers are shared with all tenderers, dated. Equal treatment is on record.

Moving to construction

The selected tender becomes the contract, then the basis for interim payment applications and variations. Nothing is re-entered.

The practice's memory

The prices obtained, the contractors invited to tender and their responses remain available for the next project.

Frequently asked questions

What we are asked most often.

Can we start from our own CCTPs (specifications)?
Yes. Your existing documents feed the practice's library; you keep your wording and your level of detail.
Do contractors have to subscribe?
No. Contractors invited to tender access the tender documents for free and submit their tender.

Demo and free trial

See Kablann in action on a project like yours.

45 minutes by video call, then a 30-day trial with all features unlocked. Nothing to install, no credit card required.

Book a demo — 45 min